Surčin-Obrenovac section of the E763 Highway project in Serbia obtains the final acceptance certificate

Source:CCCCTime:2022-02-24

Recently, the Surčin-Obrenovac section of the E763 highway project in Serbia passed the final acceptance and successfully obtained the final acceptance certificate.

Recently, the Surčin-Obrenovac section of the E763 highway project in Serbia passed the final acceptance and successfully obtained the final acceptance certificate.
With a total length of 17.582 kilometers, the Surčin-Obrenovac section is connected to the Belgrade-Surčin section of the E763 highway under construction. Its main control project is the bridge across the Sava River and the Kolubara River, with a total length of 1,581 meters.
The project started in May 2017 and passed the initial acceptance in December 2019. The early completion of the project won high praise from the Serbian government and the owner. After opening to traffic, it will help the local social and economic development and greatly facilitate the travel of local residents.

Editor: CRBC