National Normalized Construction Method

Source:Time:2010-11-14

 

0506 National Normalized Construction Method

No.

Method No.

Method name

Main undertaker

1

YJGF047-2006

Normalized construction method of marine work GPS remote piling positioning

CCCC Third Harbor Engineering Co., Ltd.

2

YJGF051-2006

Normalized construction method of submersible barge shipping caisson

CCCC First Harbor Engineering Co., Ltd.

3

YJGF052-2006

Normalized construction method of bagged concrete soil solidification marine cofferdam embankment

1, CCCC First Harbor Engineering Co., Ltd.

2, Tianjin Port Engineering Institute Ltd. of CCCC First Harbor Engineering Co., Ltd.

4

YJGF053-2006

Normalized construction method of caisson-cylindrical foundation structure air-bearing towage and negative pressure sinking

CCCC First Harbor Engineering Co., Ltd.

5

YJGF054-2006

Normalized construction method of integrating marine bridge cushion cap and cushion cap collision-proof facility

Road & Bridge International Co., Ltd

6

YJGF055-2006

Normalized construction method of underwater multi-hole hollow block installation

CCCC Third Harbor Engineering Co., Ltd.

7

YJGF056-2006

Normalized construction method of bottom protection soft body paving

CCCC Third Harbor Engineering Co., Ltd.

8

YJGF058-2006

Normalized construction method of multi-void water drainage and noise absorption asphalt road surface

1. Shanghai Pudong Road & Bridge Construction Co., Ltd.

2. China Construction Eighth Engineering Division

3. Beijing Municipal Group

4. Beijing General Municipal Engineering Design & Research Institute

5. Beijing Municipal Engineering Administration Department

6. CCCC Second Highway Engineering Co., Ltd.

9

YJGF062-2006

Normalized construction method of pre-stressed concrete continuous box girder section short line matching method prefabrication, bridge girder erection machine suspension construction

1. Jiangsu Sutong Bridge Construction Headquarters

2. CCCC Second Harbor Engineering Co., Ltd.

3. China Railway Major Bridge Engineering Group Co., Ltd.

4. Guangzhou Municipal Construction Mechanization Co., Ltd.

5. CR17BG No. 6 Engineering Co., Ltd.

10

YJGF063-2006

Normalized construction method of super-large steel boxed cofferdam water overall assembly installation

1. Jiangsu Sutong Bridge Construction Headquarters

2. CCCC Second Highway Engineering Co., Ltd.

11

YJGF069-2006

Normalized construction method of installation of cable tower steel anchor box of cable-stayed bridge

1. CCCC Second Harbor Engineering Co., Ltd.

2. Jiangsu Sutong Bridge Construction Headquarters

12

YJGF070-2006

Normalized construction method of horizontal splicing and vertical lifting twisting of steel arch bridge

Road & Bridge International Co., Ltd

13

YJGF100-2006

Normalized construction method of control loading explosion sedimentation packing replacement

CCCC Fourth Harbor Engineering Co., Ltd.

14

YJGF102-2006

Normalized construction method of mud jack concrete humid construction

CCCC First Harbor Engineering Co., Ltd.

15

YJGF103-2006

Normalized construction method of Super-long and super-diameter bored concrete piles of bridge project

1. CCCC Second Harbor Engineering Co., Ltd.

2. China Railway 14th Bureau Group Co., Ltd.

16

YJGF230-2006

Normalized construction method of “three-anchor five-cable” cutter-suction dredge

CCCC Tianjin Dredging Co., Ltd.

17

YJGF235-2006

Normalized construction method of coal gangue filling roadbed construction

China First Highway Engineering Co., Ltd.

18

YJGF237-2006

Normalized construction method of cement stabilization regeneration mixed material base layer

CCCC Second Highway Engineering Co., Ltd.

19

YJGF252-2006

Normalized construction method of cable-stayed bridge pre-stressed concrete single cable plane cradle construction

1. Guangdong Provincial Changda Highway Engineering Co., Ltd.

2. Road & Bridge International Co., Ltd

20

YJGF253-2006

Normalized construction method of steel box girder double crane hoisting

1. CCCC Second Harbor Engineering Co., Ltd.

2. Jiangsu Sutong Bridge Construction Headquarters

21

YJGF255-2006

Normalized construction method of hydraulic creeping formwork of high towers (piers) of bridge

CCCC Second Harbor Engineering Co., Ltd.

0708National Normalized Construction Method

No.

Method No.

Method name

Undertaker

1

YJGF045-2008

Normalized construction method of road splicing of road expansion project

1.China First Highway Engineering Co., Ltd.

2

YJGF046-2008

Normalized construction method of construction of waterproof bonding layer of modified asphalt of hot-sprayed polymer

China Third Highway Engineering Co., Ltd.

3

YJGF063-2008

Normalized construction method of construction of large-span bridge steel tower

1.Hunan Road & Bridge Construction Group Corp.

2.China Communications Construction Co., Ltd.

4

YJGF071-2008

Normalized construction method of installation of cable tower steel anchor beam of cable-stayed bridge

China Communications Construction Co., Ltd.

5

YJGF076-2008

Normalized construction method of construction of underwater non-sealed concrete caisson

1. Shandong Hi-Speed Qingdao Expressway Co., Ltd.

2.Road & Bridge International Co., Ltd

6

YJGF077-2008

Normalized construction method of construction of root-type caisson foundation

1. CCCC Second Highway Engineering Co., Ltd.

2. Road & Bridge International Co., Ltd

7

YJGF078-2008

Normalized construction method of sand sack filling and paving, and closure gap closing at beach and flat as well as seawall

1.CCCC Shanghai Dredging Co., Ltd.

2.Nantong Wujian Construction Co ., Ltd.

8

YJGF084-2008

Normalized construction method of construction vacuum pre-stressed joint strong tamping rapid reinforcing dredging soil

CCCC Fourth Harbor Engineering Co., Ltd.

9

YJGF085-2008

Normalized construction method of water anchor pile construction

CCCC Fourth Harbor Engineering Co., Ltd.

10

YJGF095-2008

Normalized construction method of high-pressure air bag supported with submersible barge water heavy piece

CCCC Fourth Harbor Engineering Co., Ltd.

11

EJGF143-2008

Normalized construction method of cold-mixed regeneration grassroots construction of asphalt concrete plant

1.Zhejiang Transportation Engineering Construction Group

2.The Third Engineering Co., Ltd. of CCCC Second Highway Engineering Bureau

12

EJGF174-2008

Normalized construction method of large-section arc bottom section girder short line prefabrication

1.Shanghai Construction Group 2. CCCC Third Harbor Engineering Co., Ltd.

13

EJGF205-2008

Normalized construction method of rapid consolidation of shallow super-soft weak soil

CCCC Fourth Harbor Engineering Co., Ltd.

14

EJGF206-2008

Normalized construction method of high-performance concrete construction of splash zone of high-pile dock

CCCC Fourth Harbor Engineering Co., Ltd.