Cooperation contract for PPP project of Nanhu Boulevard, Wuhan is signed

Source:Second Harbour EngineeringTime:2019-04-03

Recently Second Harbour Engineering and the Wuhan Urban and Rural Construction Bureau have signed the Cooperation Contract for PPP Project of Nanhu Boulevard, Wuhan, marking that the project has entered the construction period.


With a full length of 5.3 kilometers and a red line width of 50 meters, in two-way six-lane design, the project stretches from Luoshi South Road in the west to Minzu Boulevard in the east. With a total investment of 749 million yuan, a cooperation period of 15 years, a construction period of 2 years and an operation and maintenance period of 13 years, in the mode of PPP, the project involves road, bridge, drainage and lighting works.


After its completion, the project will improve the expressway system of downtown Wuhan, ease the cross-river traffic of Yangsigang Yangtze River Bridge and the traffic in Nanhu area, strengthen inter-district transport and communication, improve the function of flood control and drainage, improve the urban environment and enhance the urban image.