Access road project of Chuxiong section of Central Yunnan Water Diversion Project is won by Tunnel Engineering

Source:Tunnel EngineeringTime:2018-07-10

On July 4, Tunnel Engineering won the bid for Lot 4 of access road construction in the Chuxiong section of Central Yunnan Water Diversion Project, with a contract amount of RMB 188 million and a contractual construction period of 487 days.


As a strategic basic project for the sustainable development of Yunnan Province, Central Yunnan Water Diversion Project consists of the Shigu water source and the general water conveyance canal. The general canal has a full length of 664 kilometers. Located in Lufeng County, Chuxiong Prefecture, Yunnan Province, with a total length of some 57.5 kilometers, the project includes 19 access roads, and involves subgrade, pavement, drainage and culvert works, slag disposal pit accessing roads, the temporary protection of slag disposal pits, traffic safety facilities, etc.