CCCC 2nd Highway Engineering wins bid for Xi’an Subway Line 3
Source:CCCC Second Highway Engineering Co., Ltd.Time:2011-12-31
On December 21, CCCC Second Highway Engineering Co., Ltd. (SHEC) won the bid for TJSG-15 section of civil works of Xi’an Subway Line 3, with a value of 265 million yuan and a construction period of 21 months. With a total length of 44.3 kilometers and 30 stations, Xi’an Subway Line 3 is a major rail transit project in the “ribbon development” of urban subway. The project involves open cut and construction of civil structures of elevated intervals and elevated stations, and is expected to be open to traffic in 2015. |
|