Langzhi Min River Bridge in Fuzhou City is won by CCCC Second Harbor Engineering Co., Ltd.

Source:CCC Second Harbor Engineering Co., Ltd.Time:2011-01-11

On 31st December 2010, CCCC Second Harbor Engineering Co., Ltd. won Section I of Langqi Min River Bridge and connection engineering. The bidding price amounted to RMB770 million with construction period of 28 months.

 

This project is located in Mawei District of Fuzhou City. The main line is 6.8km long with bridge of 2675m long. The main bridge is a cable-stayed bridge with dual tower and steel box girder structure. CCCC Second Harbor Engineering Co., Ltd. are responsible for 634m-long main bridge and connection engineering.