Intercity Thoroughfare Project in Henan Province

Source:Time:2008-11-11

This project is provided with a total length of 39.11km, designed vehicle speed 80km/h and 10 lanes. CCCC Forth Highway Engineering Co., Ltd contracted to build the first contract section with a total length of 0.85km in Yaoqiao Town, Jinshuidong District, Zhengzhou City, and the main structure is separated overpass composed of U trough and box culvert made of reinforced concrete. This project was started in December 2005 and completed in November, 2006.