Shanghai Luo Jing Port Phase II

Source:企业文化部Time:2010-04-21
Shanghai Luo Jing Port Phase II, South Branch of Changjiang River in the south, nearby the town of Baoshan District, Shanghai Luo Jing, engineering design for the ore docks, coal docks and steel complex of three loading and unloading terminal areas, deep water shoreline 2720 meters, land area of 1,419,000 square meters, the new nine berths large deep sea vessels and the corresponding 24 "water of transit" berths. Engineering the design throughput capacity of 43.8 million tons, Shanghai Port has so far invested in the construction for the largest bulk cargo port integrated. Project started construction in June 2005, July 2008 final acceptance.