Design Project of Phase Ⅴ of Qinhuangdao Port Coal

Source:Time:2008-07-28

The phase Ⅴof Qinhuangdao port coal is a national key project in 2005 and includes two 50,000T berths, one 100,000T berth, one 150,000T berth, five unit works of bank revetment, wagon tipper room, corridor, shoreline with a total length of 1187m as well as fabrication and installation of 106 large-scale caissons. The quay berth is provided with a caisson gravity structure, and the bank revetment adopts two structures, i.e. caisson gravity structure and riprap slope embankment. This project was started on July 29, 2004 and completed on December 31, 2005.