Design Project of Shenzhen Bay Highway Bridge

Source:Time:2008-07-28

This bridge has a length totaling 4770m of which 1600m is the part within Shenzhen and is equipped with two-way six lanes and emergency parking strip on both sides. Navigation holes are designed with cable-stayed bridge with single pylon, single cable plane and steel box girder while the non-navigation holes are provided with pre-stressed concrete box girder with equal sections. The preliminary design for Shenzhen Bay Highway Bridge was completed in May 2003, construction was started on August 28, 2003 and it was completed and opened to traffic on July 1, 2007.