Huanghua Breakwater Project

Source:Time:2008-10-15

The total length of this breakwater project is 5030m and its structure is soft base and riprap slope embankment The cast-in-situ concrete for the wave wall on the top of breakwater is 13713m3. The slope surface is paved by 5581 pieces of lattice board. The new technology such as laying extensive high-strength geotextile underwater to reinforce the soft base, etc was applied in the construction.