Pulandian Bridge

Source:Time:2008-10-15

This project has a total length of 1026m and a width of 25.6m, consists of abutment, approach bridge and main bridge and is the largest pre-stressed reinforced concrete bridge spanning the sea. Six new technologies such as large-diameter (D2.0m) punching rock-socketed underwater cast-in-situ pile, etc were applied in construction.