Night View of E'Huang Bridge

Source:Time:2008-10-16

E’Huang Bridge has a total length of 3245m, of which the main bridge accounts for 1290m. This is a concrete cable-stayed bridge with the main span 480m. CCCC Second Harbour Engineering Company Ltd contracted to build the main part of this bridge in 1999. Pile-driving with three-directional positioning shipswas firstly applied for driving the steel-tubular pile, which is an initiation in China. This bridge was completed and opened to traffic in 2002.