Dredging Work for navigational Channel of Guangzhou Port (two figures)

Source:Time:2008-05-22

广州港出海航道疏浚工程

广州港出海航道疏浚工程1

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.